Home ArcStop Prevention Program What can you do about it? Industry Updates Folks that care Content for clients Find out what we can do for you!


The Six Steps of ArcSTOP

1. Discovery & Engineering

2. ID & Documentation

3. Program Preparation & Admin

4. Training & Certification

5. Field Execution & Doc Control

6. Program Review & Update


2. Identification and Documentation

During Identification and Documentation, each electrical asset is labeled and identified with a warning label that meets the ANSI Z535.4-1998 specification per NEC-2005.

Step 2 in ArcSTOP includes:

< Establishing an electrical asset report

< Preparing engineering drawings

< Preparing arc flash report

< Applying warning labels.

 

Telephone: 678.546.6400 • Fax: 678.546.6401
Copyright© 2010 ArcSTOP
  is a service of M.C. DEAN Inc. All Rights Reserved
M.C. Dean homepage